house renovation update

So many people have been asking for a house update!

If you follow me on Instagram, you’ve seen bits and pieces of the process here and there! Unfortunately, I didn’t get to move back home before Colette arrived… Although we technically could have, we really wanted to take our time getting settled back into our home especially with all the fresh paint. We just wanted everything to be cleared out 100% before we brought the family back in.

So this is the current state as of two weeks ago when we shot these photos at the house. I’ll be revealing as much as I can to you guys over the next few weeks to try and keep you updated in real time! I’m so excited about everything happening because Allen and I have been wanting to do these renovations to the house ever since we bought it 3 years ago! We love how open the floor plan is, especially the living room and kitchen area, but since it was such an old house when we bought it, we never really got the chance to really customize it and make it more modern until we met our interior designer, Erick!

Although, I did feel really crazy when I realized I agreed to start renovation just 3 months shy of my due date, the entire house is pretty much having something done to it. The kitchen is the biggest project by far, but all 4 bathrooms are being totally re-hauled too!

We decided to give Chloe the master bedroom which used to be Allen and my room (which is on the smaller side), Colette now has Chloe’s old room, and we’re transforming the playroom on the first floor into our master room. It’ll give Allen a lot of privacy and separation and we’re really happy to have the kids upstairs together! Once we finish with the masteroom it was a complete mess, Cleaning services Edmonton helped us to clean in deep for a very affordable cost.

I’ve been working with Erick, who’s been so patient and amazing! You might remember that he also helped vamp up our office as well)! He gets my aesthetic, has been taking control of the entire project and I really trust him and his eye so it makes the whole process so much easier.

Check out all the photos to see more! The adventure continues, however. I still have to have the floors refinished and buy furniture (oh ya, I do have to live in this thing!). I’m about 4-5 weeks away from completion. The neighbourhood still doesn’t buy the fact that I’m moving in (they think I’m going to flip the house).

So things are almost done (thank goodness). It’s been 3 months and alot of work, time and money. It will be nice to enjoy it at long last!

3 Comments so far »

  1. Peter Bruton said,

    Wrote on May 18, 2006 @ 08:43:52

    Internet Explorer 6.0 Windows XP

    Hello;

    Nice kitchen. Stainless steel appliances. Very nice.

    See you next time you are in Ottawa.

    Peter Bruton

    Posted from Canada Canada
    Internet Explorer 6.0 Windows XP
  2. Sean Gillies said,

    Wrote on June 14, 2006 @ 13:51:52

    Mozilla Firefox 1.5.0.4 Mac OS X Mach

    Nice! Funny, I got the same fridge and range/oven for my kitchen remodel in 2004. Our kitchens are similiar, but we choose to take out the wall between the kitchen. Cheers.

    Posted from United States United States
    Mozilla Firefox 1.5.0.4 Mac OS X Mach
  3. tomkralidis said,

    Wrote on June 14, 2006 @ 14:02:46

    Mozilla Firefox 1.5.0.4 Windows XP

    Yeah, I thought of that; that wall is load bearing, so I didn’t want to get into hassles of structural and new beams, etc. 🙂

    Posted from Canada Canada
    Mozilla Firefox 1.5.0.4 Windows XP

Comment RSS · TrackBack URI

Leave a Comment

Name: (Required)

E-mail: (Required)

Website:

Comment:

Modified: 13 December 2019 23:27:01 EST